Commissioned by Gusto Construction, G30 Consulting were appointed to undertake the infrastructure design work for a five unit private residential development on the Greenfield site off Station Road, Collingham.
Working closely with the client and Studio G Associates the following works were delivered:
- Drainage investigation work and detailed design of private foul water drainage system to discharge to Severn Trent water sewer.
- Discussions with the local highways authority to approve the new site entrance.
- SUDS drainage strategy for the disposal of surface water runoff from the development.